Login |  Register |  help

Tom Storf and Ace Reconditioning save the day!!

Posted Sunday, September 06, 2009 by Ed Dalton
At 7pm Thursday night 24 hours before the CM game a pipe broke in the varsity locker room and raw sewage poured in and sprayed all over the facility, about 50 sets of uniforms and equipment and all of our electronic equipment.  By 9pm talk of postponing the season opener with CM was a real possibility.  But thanks to Mr. Tom Storf and Ace Reconditioning we were able to get around 50 sets of equipment cleaned and sanatized and back to Hiller Stadium by 3pm on Friday.
     Thanks to our school districts custodial and maintenance crews we were able to totally gut the lockerrom sanatize and wipe down everything, remove the carpet and put the entire room back together by 3pm.  Special kudos to Mr. Keruskin, Mr. C. Daloia, Mr. Kuzman, Mr. Abbott, Mr. Crowl, Mr. Brown and Mr. bombash, who all went the extra 50 yards to get this done.  Finally a large thanks to our acting Superintendent Mr. marks and our School Board who gave us the go ahead to get this done right!

This page was created in 0.2959 seconds on server 132